If you recall, I put up a soffit a little too soon so I had to rip it down. If you also recall, my last blog talked about how I installed the ducts, so I was able to spend the morning on Saturday putting that soffit back together. It's surprising how easy it was after having done it once before. :)
Evening, and Sunday morning was framing the rest of
the basement and I pretty much covered that in previous
entries. What I didn't anticipate was having to go back
through the basement and place nailer boards on almost
every wall and the soffits for future drywall. Thanks to my Brother-in-law Dan for the advice over the phone. So for 4 hours, I did that. There is a little more framing to do like the bathroom closet, the rough in for the shower, and a couple of more soffits in the bedrooms.
If there is one negative about this weekend was that I have discovered that the laundry isn't quite as big as I thought is was but after talking to my awesome wife, she is fine with the size. Another negative was that I didn't get to spend much time with my family.
It is now time to relax and watch the Super Bowl. The next time I write I hope to be covering either plumbing or electrical.